top of page

By Simon Pears Groundwork & Excavations
simon.pears@orange.fr
07. 88. 18. 52. 22
Designing and building a variety of outdoor arenas to suit your equine needs
Gallery


Dig

Leveling
The level of each layer is surveyed and checked by laser.

Drainage
A series of perforated piping, crossing the soak away, is used to provide adequate drainage.

Drainage
Geo-textile is laid in two layers, one underneath the piping, and one on top of the stone base layer.

Stone

Stone Compacting
Well-compacted base material aids in appropriate drainage.

Stone to Sand
The sand is spread carefully and evenly across to ensure proper footing for the horse's safety.

Sand and Fibres
A thin layer of cushioning fibres is spread on top of the layer of sand.

Final View
A final thin layer of sand is spread on top of the fibres.
bottom of page